See All Projects

Project

Catagunya Dam Flume Spillway Erodibility Study

Client: Pells Consulting
Location: Catagunya Dam
Date: 2024 to 2025

Catagunya Power Station is a hydropower facility located on the Derwent River owned and operated by Hydro Tasmania.  It operates on water delivered to the turbines via a long flume leading from Lake Catagunya.  This flume includes a lateral spillway which casts flow over a steep unlined spillway. Hydro Tasmania is considering changes to the operation of the power station which may lead to increased frequency and magnitude of spills from the flume spillway. To assist with assessing these changed operations, Hydro Tasmania was seeking to understand the business and safety risks that may arise from ongoing erosion of the unlined spillway under these spillway flows. Hydro Tasmania engaged Pells Consulting to undertake the study.

Pells Consulting commissioned Geological Consulting to provide the study’s geological inputs. This included developing a geological model and assigning geological domains on the unlined slope, which is similarly vulnerable to erosion. Interpreted rock mass indices were also provided.

Testimonials

Geological Consulting has supported Stantec on several New Zealand dam safety projects. They have provided desktop studies and site investigations; where a good understanding of the local geology, dam and foundation materials, instrumentation, and wider dam safety issues including flooding, internal erosion and seismicity has been required. They have consistently exceeded expectations in terms of technical delivery, programme, safety, and end-client satisfaction.

Stantec New Zealand
Principal Dams Engineer

Stantec has partnered with Geological Consulting on several projects in Australia that have required dam geology expertise. They adopt an approach that is thorough and systematic, conforms to practice, and upholds high ethical standards. They are an asset for any project with complex geological challenges.

Stantec Australia Pty Ltd
Project Manager